top of page

Oroville Dam

/

/

Oroville Dam

Project Location

Oroville, California

Project Type

High Security Government Security Fencing & Gates

Project Description

Sloan Security Group provided & installed 7,300 LF of 8FT Welded Wire Fence with barbed wire, and razor wire 5,300 LF of 10FT Welded Wire Fence, with barbed wire and razor wire, 2- manual swing gates,4- operated crash gates, 3 - operated slide gates, 3- wedge barriers, 4- operated swing gates, 49-removable bollards,4 semi automatic bollards, 46-fixed bollards.

Project Challenges

Sloan Security Group was selected to work on the Oroville Dam to improve perimeter security to meet California Department Of Water Resources security requirements, while they were rebuilding the spillway. This project was to protect critical infrastructure from any acts of vandalism or terrorism.

Industry

Dams

Client

Ames Construction

Contractor

N/A