Intrusion Detection and Perimeter Security Upgrades

Sloan designed, pre-built, and installed specialty doors and associated security equipment at a nuclear lab facility.

Idaho National Lab’s Spent Fuel Rod Storage Site Security Upgrades

SSG served as the site general contractor in installing 3,000 lf of security fence and 21 custom heavy-duty gates in a tight 30 day schedule, while coordinating the site survey, air vacuum excavation, and electricians inside a tight Nuclear security environment

Intrusion Detection and Perimeter Security Upgrades

Sloan designed, pre-built and installed specialty security doors and associated security equipment at a nuclear lab facility.

Los Alamos National Lab Security Upgrades

After a congressional investigation slammed Los Alamos’ security upgrades program, Sloan delivered this critical upgrades project on time and on budget.