Project Description  Sloan Security Group (SSG) was the general contractor on this security project.  SSG installed security fencing and gates while coordinating subcontractors that performed electrical, access controls, engineering, surveying, and miscellaneous concrete work.   SSG removed 5,945 lf of barb wire fencing, installed 15,800 lf of security fence, and installed 14 vertical lift gates and associated systems around Boise Airport.

SSG worked with the City of Boise/and TSA to make sure that the new perimeter security system would meet FAA security requirements, while meeting the client’s expansion schedule, its tenant needs and all safety requirements.

SSG coordinated all surveying and engineering, and access controls with various subcontractors and facilitated project meetings.

Project Challenges
  •  Successfully completing the project on time despite record rainfall during the construction period;
  • Maintaining site security;
  • Phasing Gate and access control installation to meet airport tenant requirements; and
  • Building security gates to meet tight security requirements.